Last updated:
San Antonio budget variables: Caliche excavation near Stone Oak, live-oak shade around Alamo Heights, SAWS watering limits, and the balance of Bermuda, St. Augustine, and drought-tolerant beds all change the measured work. The calculator uses about $40 per maintenance visit and $8,000 to $25,000+ for broad full-install scenarios. Confirm quantities and exclusions in writing by calling (210) 864-8662.
Confirmation point 2 before Budget Planning: Budget Inputs
Estimate your project across the San Antonio metro (Bexar, Comal, Guadalupe, and Kendall counties). South-Central Texas conditions move pricing: Blackland Prairie shrink-swell clay on the east side, shallow stony alkaline clay over Edwards Plateau limestone to the north and west, warm-season turf, and SAWS watering rules tied to the Edwards Aquifer.
Lawn mowing & maintenance (per visit)
Sod installation (installed)
Irrigation system install
Paver or flagstone patio
Retaining wall
Water-wise / xeriscape conversion
Full landscape design & install
Tree trimming
Get a Free Written Quote or call (210) 864-8662
(function(){
var R={lawn:{u:”Square feet of lawn area”,lo:0.008,hi:0.016,flo:40,fhi:65,note:”Per mowing visit; recurring plans lower the per-visit cost.”},sod:{u:”Square feet of new sod”,lo:1.5,hi:2.75,flo:600,fhi:1000,note:”Installed including basic soil prep; grass type affects price.”},irrigation:{u:”Square feet of yard to cover”,lo:0.45,hi:0.95,flo:2800,fhi:4500,note:”Full install with controller and zones, sized for SAWS schedules.”},patio:{u:”Square feet of patio”,lo:14,hi:30,flo:1800,fhi:3000,note:”On a base built for clay or rocky ground.”},wall:{u:”Square feet of wall face”,lo:35,hi:75,flo:1500,fhi:3000,note:”Engineered base matters on clay and Hill Country slopes.”},xeriscape:{u:”Square feet converted”,lo:6,hi:16,flo:1500,fhi:3500,note:”Native and adapted beds, decomposed granite, drip; cuts long-term water cost.”},design:{u:”Square feet of project area”,lo:8,hi:25,flo:5000,fhi:12000,note:”High end includes hardscape, lighting, and irrigation.”},tree:{u:”Number of trees”,lo:250,hi:700,flo:0,fhi:0,note:”Per tree. Avoid pruning live oaks Feb to Jun (oak-wilt season).”}};
var t=document.getElementById(“wfc-type”),s=document.getElementById(“wfc-size”),u=document.getElementById(“wfc-unit”),h=document.getElementById(“wfc-hint”),o=document.getElementById(“wfc-out”);
function fmt(n){return “$”+(Math.round(n/10)*10).toLocaleString();}
function calc(){var r=R[t.value],q=parseFloat(s.value)||0;u.innerHTML=r.u;h.innerHTML=r.note;var lo=q*r.lo,hi=q*r.hi;if(r.flo){lo=Math.max(lo,r.flo);}if(r.fhi){hi=Math.max(hi,r.fhi);}o.innerHTML=q>0?(fmt(lo)+” – “+fmt(hi)):”—”;}
t.addEventListener(“change”,calc);s.addEventListener(“input”,calc);calc();
})();
Frequently Asked Questions
Confirmation point 3 before Budget Planning: Budget Inputs
San Antonio scope inputs: Measure maintained turf, paving area, planting beds, access, haul-off, and every irrigation change before comparing a proposal. The NRCS Bexar-series description places hard limestone roughly 20 to 40 inches down, so excavation and base preparation must be confirmed on site rather than priced from a copied regional range.
Does a xeriscape conversion save money in San Antonio?
Up front a water-wise conversion runs about $6 to $16 per square foot, but with SAWS watering limits it lowers long-term water and maintenance costs and holds up through Edwards Aquifer drought stages.
Why does rocky Hill Country soil affect my project cost?
Shallow soil over limestone means more bed-building, soil amendment, and base prep, which adds labor on the north and west sides of the metro compared with deeper clay sites.
{“@context”:”https://schema.org”,”@graph”:[
{“@type”:”Organization”,”@id”:”https://sanantonioprolandscape.com#organization”,”name”:”San Antonio Pro Landscape”,”url”:”https://sanantonioprolandscape.com”},
{“@type”:”HomeAndConstructionBusiness”,”@id”:”https://sanantonioprolandscape.com#localbusiness”,”name”:”San Antonio Pro Landscape”,”url”:”https://sanantonioprolandscape.com”,”telephone”:”(210) 864-8662″,”address”:{“@type”:”PostalAddress”,”addressLocality”:”San Antonio”,”addressRegion”:”TX”,”addressCountry”:”US”},”areaServed”:[“San Antonio”,”Bexar County”,”Comal County”,”Guadalupe County”,”Kendall County”],”priceRange”:”$$”},
{“@type”:”WebApplication”,”@id”:”https://sanantonioprolandscape.com/landscaping-cost-calculator/#app”,”name”:”San Antonio Landscaping Cost Calculator”,”applicationCategory”:”BusinessApplication”,”operatingSystem”:”Web”,”offers”:{“@type”:”Offer”,”price”:”0″,”priceCurrency”:”USD”},”provider”:{“@id”:”https://sanantonioprolandscape.com#localbusiness”}},
{“@type”:”FAQPage”,”@id”:”https://sanantonioprolandscape.com/landscaping-cost-calculator/#faq”,”mainEntity”:[{“@type”:”Question”,”name”:”How much does landscaping cost in San Antonio?”,”acceptedAnswer”:{“@type”:”Answer”,”text”:”As a planning range, lawn maintenance runs about $40 to $70 per visit, a paver patio $14 to $30 per square foot, and a full design-and-install commonly $8,000 to $25,000+. These are regional estimates, not a quote — call (210) 864-8662 for a written number.”}},{“@type”:”Question”,”name”:”Does a xeriscape conversion save money in San Antonio?”,”acceptedAnswer”:{“@type”:”Answer”,”text”:”Up front a water-wise conversion runs about $6 to $16 per square foot, but with SAWS watering limits it lowers long-term water and maintenance costs and holds up through Edwards Aquifer drought stages.”}},{“@type”:”Question”,”name”:”Why does rocky Hill Country soil affect my project cost?”,”acceptedAnswer”:{“@type”:”Answer”,”text”:”Shallow soil over limestone means more bed-building, soil amendment, and base prep, which adds labor on the north and west sides of the metro compared with deeper clay sites.”}}]}
]}